Within the framework of the implementation of the project MAINTENANCE OF 22 RAILWAY STATIONS , the following works were carried out:
- Replacement of luminaires
- Replacement of 60 old air conditioners
- Replacement of 12 old air curtains
- Maintenance of Medium Voltage Substations
- Installation of new loudspeaker installations
- Installation of new rolling doors
- Replacement of Cutter Pumps in wc
- Replacement of Safety Roller Shutter Mechanisms - blinds
- Fault Removal on a 24-hour basis
- Update and Issuance of Fire Safety Certificates
- Replacement of fire safety panels
- Generator Maintenance