Within the framework of the implementation of the project MAINTENANCE OF 22 RAILWAY STATIONS , the following works were carried out:

  • Replacement of luminaires
  • Replacement of 60 old air conditioners
  • Replacement of 12 old air curtains
  • Maintenance of Medium Voltage Substations
  • Installation of new loudspeaker installations
  • Installation of new rolling doors
  • Replacement of Cutter Pumps in wc
  • Replacement of Safety Roller Shutter Mechanisms - blinds
  • Fault Removal on a 24-hour basis
  • Update and Issuance of Fire Safety Certificates
  • Replacement of fire safety panels
  • Generator Maintenance